WD.PARK anglia way

NORTHAMPTON // NN3 6JA

WD.PARK anglia way

NORTHAMPTON // NN3 6JA

NEW INDUSTRIAL / WAREHOUSE UNITS

This high specification scheme comprises of two self-contained units ranging
from 21,528 sq ft to 25,747 sq ft providing for a total development of 47,275 sq ft.
Practical completion will be achieved in Q1 2024.

Units 1 & 2

Units 1 & 2 at WD.PARK anglia way comprises of two self-contained units, ranging from 21,528 sq ft to 25,747 sq ft.

All areas are approximate on a GIA (Gross Internal Area) basis.

SPECIFICATION

  • 8m clear internal height
  • Steel portal frame construction
  • 4.8m high electrically operated loading doors
  • Secure cycle parking
  • Uniformly distributed 50kN/m2 floor slab loading
    • 3 phase power supply

    • Mezzanine floor for office or
      additional storage uses

    • Dedicated yard area and car parking

    • Electric vehicle charging points

    • 15% warehouse roof lights

LOCATION

The site is situated fronting Summerhouse Road/Anglia Way on the Moulton Park Industrial Estate, one of the town’s key employment areas, and is home to a number of major occupiers such as Nationwide Building Society, Horiba, Winvic Construction and Greencore.

Moulton Park is approximately 4 miles north east of Northampton town centre. Located in the heart of England, Northampton’s central location offers excellent communication links, with three junctions of the M1 motorway (15, 15A and 16) all providing easy links to Birmingham in the north, and London to the south.
The A14 is located approximately 10 miles to the north
and provides access to the east coast ports.

The town benefits from a good train service to London Euston.

EPC
Targeting an EPC certificate rating of A.
Targeting BREEAM ‘VERY GOOD’.

VAT
All prices quoted are exclusive of VAT, which will be chargeable at the prevailing rate.

LEGAL COSTS
Each party to be responsible for their own legal costs.

TERMS
Unit 2 is available on both a freehold and leasehold basis with terms available on application

PLANNING
Unit 2 benefits from detailed planning permission for Class E(g)(iii) (Light Industrial), B2 (General Industrial) and B8 (Storage and Distribution) uses.

TIMING
Speculative development which will be practically complete in Q1 2024.

ENQUIRE NOW

Oliver Thompson
 oliver@tdbre.co.uk
 07837 191 054

Jack Brown
 jack@tdbre.co.uk
 07969 291660

Richard Baker
richardbaker@prop-search.com
07725 834 136

Ian Harman
ianharman@prop-search.com
07725 834141

Another Development by:

Stuart Mair
  smair@warmflamedevelopments.com
 07711 055 144

These particulars are believed to be correct at the date of publication, but their accuracy is in no way guaranteed, neither do they form part of any contract. All areas are approximate. October 2022.